Vizag Modern Tram System 

Assignment Name : Design Consultancy Services for “Preparation of Detailed Project Report (DPR) for implementation of Catenary free modern Tram System at Vizag, Andhra Pradesh.

 

Description of Project:

Detailed Design of Mass Transit Corridor Alignment for client. such as
• Alignment Fixation
• ROW design
• Goemetric Designing of At grade and Elevated Corridors
• At-grade and Elevated station
• Depot Design
• Line Estimates
• Nominal Structural Design

Narrative Description of Project:
Design Consultancy Services for “Preparation of Detailed Project Report (DPR) for implementation of Catenary free modern Tram System at Vizag, Andhra Pradesh.” 

Salient Features of the Project:

  • Total Length of Alignment : : 60.5 Km’s.
  • Corridor 1 (NAD - Pendurthi) : 10.95 Km’s
  • Corridor 2 (Steel Plant – Anakapalle) : 18.20 Km’s 
  • Corridor 3 (Old Post Office – Rushikonda) : 15. 23 Km’s
  • Corridor 4 (Rushikonda – Beemilipatnam) : 16.98 Km’s 
  • Total number of stations : 49
  • No. of Depots : 3
Hyderabad HO:
  • F.No.201, La Pallazzo, A-Block,
  • Sri sai srinivasa hills,
  • Durgam cheruvu road,
  • Madhapur, Hyderabad,
  • Telangana - 500081.
Guntur RO:
  • H.No : 12-1-86,
  • KVR Trust,
  • Factory Road,
  • Kothapet,
  • Guntur - 522001.
Chennai RO:
  • Old door No. 68/1,
  • New door No. 2, AD Block
  • 2nd floor, II nd Street,
  • Anna Nagar,
  • Chennai - 600040.

 

Social

This page was started with Mobirise web theme