Vizag Lite Metro 

Assignment Name : Design Consultancy Services for “Preparation of Detailed Project Report (DPR) for lite metro at Vizag, Andhra Pradesh.”

 

Description of Project:

Detailed Design of Mass Transit Corridor Alignment for client. such as
• Alignment Fixation
• ROW design
• Geometric Designing of At grade and Elevated Corridors
• At-grade and Elevated station
• Depot Design
• Line Estimates
• Nominal Structural Design 

Design Consultancy Services for “Preparation of the DPR for 79.91 Kms for Implementation of Light Metro for VMRDA area in Visakhapatnam”

Salient Features of the Project:

  • Total Length of Alignment : 79.91 Km’s.
  • Corridor 1 (Steel Plant - Kommadi) : 34.37 Km’s
  • Corridor 2 (Gurudwara – Old Post Office) : 5.07 Km’s 
  • Corridor 3 (Tadichetlapalem – Chinna Valteru): 6.82 Km’s
  • Corridor 4 (Kommadi – Bogapuram) : 30.28 Km’s 
  • ROW : 30M
  • Total number of stations : 56
  • No. of Depots : 2
Hyderabad HO:
  • F.No.201, La Pallazzo, A-Block,
  • Sri sai srinivasa hills,
  • Durgam cheruvu road,
  • Madhapur, Hyderabad,
  • Telangana - 500081.
Guntur RO:
  • H.No : 12-1-86,
  • KVR Trust,
  • Factory Road,
  • Kothapet,
  • Guntur - 522001.
Chennai RO:
  • Old door No. 68/1,
  • New door No. 2, AD Block
  • 2nd floor, II nd Street,
  • Anna Nagar,
  • Chennai - 600040.

 

Social

Created with Mobirise website template